Lean Construction in a Real Estate Project – A Case Study

Authors

  • K. Srinivas Email Senior Faculty, National Academy of Construction

DOI:

https://doi.org/10.30564/jcr.v1i2.2577
Received: 16 November 2020 | Published Online: 6 February 2021

Abstract

Majority of all the construction projects experience cost and time overruns for reasons which are many times beyond the control of stakeholders. To overcome the same, the concept of lean integrated project delivery came into existence. Lean culture focuses on customer by empowering employees. It involves in converting waste into value by reducing waste, improving communication, and promoting teamwork integration through a common set of tools and techniques. Aim of lean construction is to achieve the affordable cost with optimum utilization of man, material and machinery. Wastes in construction industry which do not add value are supply in excess materials in inventory for raw material, work in progress, finished goods etc. Waiting for preceding activity, over processing and defects can be reduced through lean construction. This paper deals with lean construction techniques for identifying the waste in a construction project and eliminating the same.. In this project estimation of a building is done to find cost of the project with respect to specifications and compared the traditional methods vis- a vis and lean construction techniques which can bring down the cost and with substantial improvement in quality aimed at satisfying the customer.

References

1) Alinaitwe, H.M.(2009), Prioritising Lean Construction Barriers in Uganda’s

Construction Industry, Journal of Construction in Developing Countries, 15-30

2) Alarcon,L.F, Grillo,A., Friene,J., and Diethelm,S. ( 2004), Learning from Collaborative

Benchmarking in Construction Industry, Proceedings of 9 th Annual Conference of

International group for Lean Construction ( IGLC-9), Singapore

3) Bhargav Dave, Juho-Pekka Hamalalinen, Sergio Kemmer , Lauri Koskela and Anssi

Koskenvessa ( 2015), Suggestions To Improve Lean Construction Planning, proceedings of

11

23 rd Annual Conference of International group for Lean Construction, Perth, Australia, 29-

31 July, 2015

4) Carlos Formoso, Eduardo Luis Isatto and Ercilia Hitomi Hirota ( 1999), Method for Waste

Control in Building Industry, 7 th Annual Conference of International Group for Lean

Construction, Berkeley, USA

5) Koskela,L. ( 1992), Application of New Production Philosophy to Construction,

Tech Report No:72, CIFE, Stanford University, Calfornia

6) Mohd Arif Marhani,Aini Jaapar, Nor Azmi Ahmad Bari and Mardhiah Zawawi ( 2013),

Proceedia- Social and Behavioral Sciences, 101:90-99 ,DOI: 10.1016/j.sbspro.2013.07.182

7) Nordin Norani, Baba Md Deros and Dzuraidah Abd Wahab ( 2010), A Survey On Lean

Manufactruing Implementation in Malaysian Automotive Industry, International Journal

of Innovation and Technology Management, 1(4); 374-380

8) Sindhwani,R., and Malhotra,V.(2015), Lean and Agile Manufacturing System Barriers,

Benchmarking- An International Journal, 3(1), 110-112

9) Tindiwensi, D. (2006). An Investigation into the Performance of Uganda Construction

Industry. PhD Thesis. Makerere University: Uganda.

Downloads

Issue

Article Type

Article